Industrial

We know that industrial facilities need HVAC too, and our team is ready to handle the job.

Featured Project

Firmenich
Anaheim, CA - Under Construction

firmenich-gallery.png

Firmenich

Our Latest Industrial Project

  • Warehouse converted to an office building

  • Two-story building with basement — 3,182 SF TI

  • One-story building – 13,500 SF TI

  • VRF system

  • 2 Dedicated Outside Air Units

  • Installation of 3 fume hoods with exhaust

  • Installation & relocation of new fume extraction arms

  • Installation of complete hood system with make-up air

  • Installation of 1 RTU and 1 split system

Featured Project

Kerry Corporation - Mecca Plant

Mecca, California - Installed in 2018

  • Aluminum cladding over closed-cell duct insulation

  • Design-build plan per Kerry specs.

  • Structural and electrical design

  • 70 ton cooling only AAON unit

  • AAON unit services cooling in a 4-pass industrial food dryer

  • Welded stainless steel food grade ducting

Industrial Projects

  • Denso - Murrieta, CA

  • Axiom Materials - Orange, CA

  • Kerry Corporation - Mecca, CA

  • Firmenich Turbo Boost Building 3 - Anaheim, CA

Industrial Facility

Contact us.

Every building needs quality design-build to MEP installation services, and industrial facilities are no exception. Connect with us today, so we can start working on your next industrial facility project!